Feasibility Study Automated Cargo Flow

Scope

Given:

Local park or field where fire department has agreed after you fill out proper paperwork and make all necessary safety training and precautions a reality you may launch engineering model.

Desired operational scenario for launch- Preflight assembly, diagnostics, travel to Terran Test SpacePort Muroc Desert.w:Murphy's Law From simulated Ridley Mission Control Center (Concrete Blockhouse, no windows ... suitable sub is adequate distance and sandbag barrier) use teleoperation interface (Notebook computer) to drive radio controlled tractor towing launch deck containing two stage cargo stack. First stage simulated c33 (VAP version of defunct Lockheed venture supposed to follow X33 but cancelled at failure of two of four? key technologies and budget overrun) second stage is Cargo RocketCargo_Imports

Required/Desired/Results

Milestones

Path Critical Suspense Date: 1 Mar 08 Sceduled Final Test Date: 15 Feb 08 CDRL (Contract Deliverable) Engineering Study Report

Schedule Risk Factors

Property On Hand

Reassignment to the project

GLOP Salvage (general left over processor) space milspeak for recycling process aid or black box specification.

Required supplies and equipment unless stick with dry run

This article is issued from Wikiversity - version of the Thursday, July 30, 2009. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.